A. Receive the machine at the plant, review the conditions in which the equipment is received to report probable damages suffered during the transfer from the place of origin to your plant.
B. Unload the machinery and peripheral equipment from containers, platforms and/or lowboy, inside or outside the building where it will be installed (as appropriate).
C. Unpacking using universal procedures and equipment appropriate for this type of work.
D. Floor layout according to the lay-out supplied and approved by the customer.
E. Machinery and equipment movement from the unloading area, to the site of its placement.
F. Installation, alignment and leveling.
G. Mechanical and/or chemical anchoring, as request according to equipment specs.
H. Displacement of surplus materials resulting from unpacking to a confinement site outside your plant.
I. Policy insurance available for mechanical maneuvers, with sums insured according to the value of the machinery.